Project Details
Redman Road Culvert Replacement
Project Scope
- Prepared drawings and contract documents to replace the deteriorating three-sided concrete culvert over West Creek.
- Culvert spanned 10’ x 70’ long at a slight skew to the road. Wing walls were installed at the east end of the culvert.
- Prepared hydrologic and hydraulic analyses and calculations, engineering reports, drawings, construction cost estimate, contract specifications, permits, detour plans and presented at public meetings.
- Benefited community from a safety perspective by reducing upstream flooding and financially by utilizing surplus materials in Monroe County stockyard.
- Construction cost originally estimated at $114,000, but actual cost was 20% under pre-project budget. Work performed by Town of Clarkson Highway Department.
Recent Projects
Helena Group Street Rehabilitation
Construction Administration
For City of Rochester
Sager Drive
Construction Administration
For City of Rochester
Wellington Woods North
Multi-Residential Site Design
For ODS Management Group
Get in Touch
Have a question about an ongoing project or have a project we might be a good fit for? Send us a message using the form or give us a call directly.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.